PAS 2035 Retrofit Coordination
Retrofit coordination fully compliant with PAS 2035 — the British standard for domestic energy efficiency retrofit. Required for all government-funded and TrustMark-registered retrofit projects.
Our qualified Retrofit Coordinators oversee every stage of your project from initial assessment through to handover, ensuring full compliance with the standard and protecting your funding. Covering ECO, SHDF, LAD, HUG and other funded schemes across our seven-county area.
PAS 2035 Retrofit Coordination
Our Home Surveyor & Property Valuer Accreditation & Professional Membership
Our PAS 2035 Retrofit Coordinations are carried out by qualified surveyors who belong to the professional bodies that set UK property standards. Every report is prepared to recognised guidance and is completely independent, so you can rely on the findings when you buy, sell or value a home.
What Is PAS 2035 Retrofit Coordination?
PAS 2035 is the British standard for domestic energy efficiency retrofit, introduced by the government in 2019. It mandates a "whole house" approach to retrofit — ensuring that energy efficiency measures are designed and installed correctly, with proper consideration of moisture risk, ventilation and building physics. At the heart of the standard is the Retrofit Coordinator: a qualified professional who oversees the project from assessment to completion and lodges the compliance documentation.
What It Covers
- Full PAS 2035-compliant retrofit coordination from inception to handover
- Whole-dwelling assessment including condition survey and occupancy evaluation
- Development of a medium-term retrofit plan tailored to the property
- Moisture risk assessment and ventilation strategy
- Design review to ensure compliance with PAS 2035 requirements
- On-site monitoring and quality assurance during installation
- Lodgement of all compliance documentation with the TrustMark data warehouse
- Final handover pack including operation and maintenance guidance
What It Does Not Cover
- Actual installation of retrofit measures (carried out by your chosen installers)
- Design of retrofit measures — though we review designs for compliance
- Funding application management (though we provide the compliance evidence required for funding)
- Post-completion monitoring beyond the handover period
- Structural engineering or architectural design services
- Planning permission or building regulations applications
Is PAS 2035 Coordination Right for Your Project?
PAS 2035 compliance is mandatory for projects receiving government funding or registered with TrustMark. Here is when you need it and when you may not.
Suitable For
- Government-funded retrofit schemes (ECO, SHDF, LAD, HUG)
- TrustMark registered projects
- Social housing retrofit programmes
- Homeowners accessing grant-funded energy improvements
Not Suitable For
- Self-funded retrofit where PAS 2035 compliance is not required (though the same principles apply)
- Single-measure installations not part of a funded programme
Not sure if your project requires PAS 2035 compliance? Speak to a Retrofit Coordinator for free, no-obligation advice.
Key Features of Our Retrofit Coordination Service
Every PAS 2035 retrofit coordination engagement we undertake includes the following as standard.
PAS 2035 Compliant Retrofit Coordination
Full coordination service delivered in strict accordance with PAS 2035:2019 and subsequent amendments, covering every stage from risk assessment through to lodgement.
Qualified Retrofit Coordinator
Your project is managed by a Retrofit Coordinator holding the Level 5 Diploma in Retrofit Coordination and Risk Management, registered with a TrustMark-registered scheme provider.
Suitable for ECO, SHDF, LAD and HUG Funded Projects
Our coordination meets the compliance requirements of all major government-funded domestic retrofit schemes, including the Energy Company Obligation, Social Housing Decarbonisation Fund, Local Authority Delivery and Home Upgrade Grant.
Whole-Dwelling Assessment and Medium-Term Retrofit Plan
We assess the entire dwelling — not just individual measures — and produce a medium-term retrofit plan that sets out a sequenced, risk-managed pathway to improved energy performance.
Quality Assurance and Compliance Documentation
We monitor installation quality on site and produce the complete compliance pack required for TrustMark lodgement, including the condition report, risk assessment, design review and handover documentation.
How PAS 2035 Coordination Works
From initial enquiry to compliance lodgement — a clear, structured process.
Initial Appraisal
Contact us with details of your project, the property and the funding scheme. We confirm scope, programme and provide a fixed-price quote within 24 hours.
Assessment & Risk Review
The Retrofit Coordinator carries out a whole-dwelling assessment, condition survey and moisture risk evaluation. A medium-term retrofit plan is developed.
Design Review & Quality Monitoring
We review retrofit designs for PAS 2035 compliance and carry out site monitoring visits during installation to verify quality against the specification.
Lodgement & Handover
All compliance documentation is lodged with the TrustMark data warehouse. The handover pack is delivered to the client including operation and maintenance guidance.
PAS 2035 Retrofit Coordination Questions
What is PAS 2035 and do I need it?
PAS 2035 is the British standard for domestic energy efficiency retrofit. It was introduced by the government in 2019 to address the problem of botched retrofit work — insulation installed incorrectly, ventilation ignored, resulting in damp and mould. PAS 2035 mandates a "whole house" approach with a qualified Retrofit Coordinator overseeing the project from assessment through to completion. If your project receives government funding (ECO, SHDF, LAD, HUG) or is registered with TrustMark, PAS 2035 compliance is mandatory. Even for self-funded projects, PAS 2035 principles represent best practice.
What qualifications does a Retrofit Coordinator need?
A PAS 2035 Retrofit Coordinator must hold a Level 5 Diploma in Retrofit Coordination and Risk Management and be registered with a TrustMark-registered scheme provider. The qualification covers building physics, moisture risk assessment, construction technology, heritage considerations and project management. Our coordinators are fully qualified and experienced in coordinating domestic retrofit projects across a wide range of property types and ages.
What types of funding schemes require PAS 2035 compliance?
PAS 2035 compliance is mandatory for all projects receiving government funding for domestic energy efficiency measures. The main schemes are: ECO (Energy Company Obligation) which funds insulation and heating measures for fuel-poor and vulnerable households; SHDF (Social Housing Decarbonisation Fund) which upgrades social housing stock; LAD (Local Authority Delivery) which provides energy efficiency upgrades for low-income households; and HUG (Home Upgrade Grant) which funds whole-house retrofit for off-gas-grid properties. If your project is funded by any of these schemes — or by a local authority or housing association — you will need PAS 2035 compliant coordination.
What is a medium-term retrofit plan?
A medium-term retrofit plan is a central requirement of PAS 2035. It is a document that sets out a logical, sequenced pathway of energy efficiency measures for a property, typically over a 20 to 30 year period. The plan considers the interaction between different measures — for example, ensuring that insulation is paired with adequate ventilation to avoid moisture problems. Each measure is assessed for its impact on building physics, cost-effectiveness and practical delivery. The plan allows homeowners, landlords and social housing providers to phase improvements over time without compromising the overall integrity of the building.
How much does PAS 2035 retrofit coordination cost?
The cost of PAS 2035 retrofit coordination depends on the number of properties, the scope of the retrofit measures and the complexity of the project. Single-property coordination typically starts from £500 plus VAT. For multi-property programmes — such as social housing schemes — we offer volume-based pricing. Every project receives a fixed-price quote within 24 hours of enquiry. Contact us with the details of your project and we will provide a clear, all-inclusive price with no hidden extras.
Do you provide retrofit coordination across all seven counties?
Yes. We provide PAS 2035 retrofit coordination across our full coverage area: Bedfordshire, Buckinghamshire, Cambridgeshire, Hertfordshire, Northamptonshire, Greater London and Oxfordshire. Our Retrofit Coordinators are locally based and familiar with the building stock, construction types and common defects in each county. We also understand the local authority and housing association landscape, which is particularly relevant for SHDF and LAD-funded programmes. If your project falls outside our core area, please enquire — we may still be able to help.
Get a Fixed-Price PAS 2035 Coordination Quote
Free, no-obligation quote within 24 hours. Delivered by a qualified Level 5 Retrofit Coordinator registered with TrustMark.





